Complete Factory Power Setup & Backup System

 
Opening Times
Monday - Friday: 09:00 - 18:00
 
Our Location
Plot 35B power line Lagos, Orile Agege
 
Customer Support
+234 813-371-8979

Project Details

Client:
Metal-Pro Manufacturing Ltd.
Location:
Ogun State, Nigeria
Value:
₦42,000,000
Year Completed:
2023
Category:
Industrial Power Setup

Project Overview

MetalPro Manufacturing needed a stable and high-capacity power system to operate their production machines and maintain 24/7 operations. Their major problem was constant voltage fluctuation and delayed switching between PHCN and generator power, which frequently damaged sensitive equipment.

We designed and installed a full factory power setup consisting of:

  • Industrial-grade wiring
  • 150kVA backup inverter system
  • Custom-built ATS panel
  • Surge and overload protection
  • Centralized distribution board

A challenge we faced was the factory’s old electrical structure, which was not suitable for high-capacity load distribution. Our team reconstructed the wiring architecture and added dedicated circuits to support heavy machinery.

The result was a fully stabilized power environment, increased production uptime, and complete protection for their equipment. The client’s production efficiency improved significantly after installation.